Volleyball Courts

Step 1: We would require to make the base of concrete plain in on piece and not in blocks .so we need to uproot the existing base of concrete of slabs.
Step 2: Mat would be welded on the concrete base.
Reasons:
- No ASPHALTING REQUIRED
- Ultra cushioned – 4.5mm, 6mm, 7mm, 8mm MAT
- Easy to paste
- Comfort for knees
- Excellent finishing
- World badminton federation approved
Synthetic Layering System (Acrylic Outdoor Sports System)
| S. No. | 3 Layers | 4 Layers | 5 Layers | 6 Layers | 8 Layers | 9 Layers | 8 Layers 3mm |
|---|---|---|---|---|---|---|---|
| 1. | Resurfacer | Resurfacer | Resurfacer | Resurfacer | Resurfacer | Resurfacer | Resurfacer |
| 2. | Filler Coat | Resurfacer | 1 Fine Layer Rubber | Resurfacer | Resurfacer | Resurfacer | 1 Coarse Layer Rubber |
| 3. | Top Coat | Filler Coat | 1 Fine Layer Rubber | 1 Fine Layer Rubber | 1 Fine Layer Rubber | 1 Fine Layer Rubber | 1 Coarse Layer Rubber |
| 4. | Top Coat | Filler Coat | 1 Fine Layer Rubber | 1 Fine Layer Rubber | 1 Fine Layer Rubber | 1 Fine Layer Rubber | |
| 5. | Top Coat | Filler Coat | 1 Fine Layer Rubber | 1 Fine Layer Rubber | 1 Fine Layer Rubber | ||
| 6. | Top Coat | 1 Fine Layer Rubber | 1 Fine Layer Rubber | 1 Fine Layer Rubber | |||
| 7. | Filler Coat | 1 Fine Layer Rubber | Filler Coat | ||||
| 8. | Top Coat | Filler Coat | Top Coat | ||||
| 9. | Top Coat |
