KrisKindu Inc.

Volleyball Courts

volleyball

Step 1: We would require to make the base of concrete plain in on piece and not in blocks .so we need to uproot the existing base of concrete of slabs.

Step 2: Mat would be welded on the concrete base.

Reasons:

  • No ASPHALTING REQUIRED
  • Ultra cushioned – 4.5mm, 6mm, 7mm, 8mm MAT
  • Easy to paste
  • Comfort for knees
  • Excellent finishing
  • World badminton federation approved

Synthetic Layering System (Acrylic Outdoor Sports System)

S. No. 3 Layers 4 Layers 5 Layers 6 Layers 8 Layers 9 Layers 8 Layers 3mm
1. Resurfacer Resurfacer Resurfacer Resurfacer Resurfacer Resurfacer Resurfacer
2. Filler Coat Resurfacer 1 Fine Layer Rubber Resurfacer Resurfacer Resurfacer 1 Coarse Layer Rubber
3. Top Coat Filler Coat 1 Fine Layer Rubber 1 Fine Layer Rubber 1 Fine Layer Rubber 1 Fine Layer Rubber 1 Coarse Layer Rubber
4. Top Coat Filler Coat 1 Fine Layer Rubber 1 Fine Layer Rubber 1 Fine Layer Rubber 1 Fine Layer Rubber
5. Top Coat Filler Coat 1 Fine Layer Rubber 1 Fine Layer Rubber 1 Fine Layer Rubber
6. Top Coat 1 Fine Layer Rubber 1 Fine Layer Rubber 1 Fine Layer Rubber
7. Filler Coat 1 Fine Layer Rubber Filler Coat
8. Top Coat Filler Coat Top Coat
9. Top Coat